National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Winery and guest house
Mrkvicová, Kateřina ; Pospíšil, Tomáš (referee) ; Pěnčík, Jan (advisor)
In my thesis I have dealt with a building plan of a winery and a boarding house located in South Moravia. It is a detached house which is embedded in a mildly steep land. The building itself is barrier free. There are two floors and a basement. There is a production of wine in the basement. It is separated into several parts such as a clean preparation room, a storeroom for wine bottles and storeroom for Nitrogen bottles, hall, emploees´area, and export. The basement and the first floor are conected with an elavator. The first floor is supposed to serve the visitors. There is a reception, a large degustation room, bar, kitchen and the sanitary facilities on the first floor. On the second floor there is acommodation for visitors. There are seven rooms adapted for two or three people. The vertical brickwork in the basement is formed by concrete blocks 50 by producer BEST. The above - grade vertical brickwork is made of ceramic blocks POROTHERM PROFI 44. The bulding is insulated with thermal insulation system Baumit open Premier. The horizontal construction is made of ceiling panels SPIROLL. A roofing above the second floor is made of nailed ties. The roof has saddle shape and is double skinned. Total height of building is thirteen metres. In front of the building there is parking lot for twelve cars and one place for disabled.
Winery and guest house
Mrkvicová, Kateřina ; Pospíšil, Tomáš (referee) ; Pěnčík, Jan (advisor)
In my thesis I have dealt with a building plan of a winery and a boarding house located in South Moravia. It is a detached house which is embedded in a mildly steep land. The building itself is barrier free. There are two floors and a basement. There is a production of wine in the basement. It is separated into several parts such as a clean preparation room, a storeroom for wine bottles and storeroom for Nitrogen bottles, hall, emploees´area, and export. The basement and the first floor are conected with an elavator. The first floor is supposed to serve the visitors. There is a reception, a large degustation room, bar, kitchen and the sanitary facilities on the first floor. On the second floor there is acommodation for visitors. There are seven rooms adapted for two or three people. The vertical brickwork in the basement is formed by concrete blocks 50 by producer BEST. The above - grade vertical brickwork is made of ceramic blocks POROTHERM PROFI 44. The bulding is insulated with thermal insulation system Baumit open Premier. The horizontal construction is made of ceiling panels SPIROLL. A roofing above the second floor is made of nailed ties. The roof has saddle shape and is double skinned. Total height of building is thirteen metres. In front of the building there is parking lot for twelve cars and one place for disabled.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.